Cities · Texas

Austin right now

It's quiet in Austin. Nothing I watch here is out of the ordinary.

Keep me posted

Veronica

Ask me about Austin

People ask things like

I keep the question to help the next person, never who asked it. Leave out anything personal.

Roads around Austin

What the road agencies list right now, drawn on the road.

ClosedCrash or incidentLanes closed for work

Closed · 113

  • I-35Full Closure of NBFR and Pedestrian Bridge North of Riverside Drive. Use Pedestrian detour on the Southbound pedestrian bridge. Vehicle Detour at WB Riverside to SB Frontage Road to U-Turn at Woodland then use Bypass Lane to Reach Holly Street.
  • S 2nd StClosed. Excavation Permit has been issued for this location. Details: The Rios Group, Inc. Through November 27.
  • South Center StClosed. Excavation Permit has been issued for this location. Details: The Rios Group, Inc. Through November 27.
  • Rountree DrClosed. Excavation Permit has been issued for this location. Through November 29.
  • Secrest DrClosed. Excavation Permit has been issued for this location. Through November 30.
  • W 44th StClosed. Excavation Permit has been issued for this location. Details: * Original work dates Sep 30, 2026 - Oct 30, 2026 Extended on Oct 20, 2026 * Installing Wastewater Service by way of a 34' x 2' Excavation in the Street, and a 10' x 2' Excavation Behind the curb, and 5' of Curb Excavation, No Sidewalk… Through November 30.
  • And 107 more, on the map.

Lanes closed for work · 3

  • FM 112 1 stretch
  • I-35 1 stretch
  • RM 150 1 stretch

Road work as the City of Austin lists it; closures from the road closures I follow.

Happening now 5 counties

  • Nothing in Austin I'd want you to know about right now.

Roadwork what the states list

I-35 northbound

Full Closure of NBFR and Pedestrian Bridge North of Riverside Drive. Use Pedestrian detour on the Southbound pedestrian bridge. Vehicle Detour at WB Riverside to SB Frontage Road to U-Turn at Woodland then use Bypass Lane to Reach Holly Street.

Texas's road conditions
S 2nd St near AustinThrough November 27

Closed. Excavation Permit has been issued for this location. Details: The Rios Group, Inc.

the City of Austin
South Center St near AustinThrough November 27

Closed. Excavation Permit has been issued for this location. Details: The Rios Group, Inc.

the City of Austin
Rountree Dr near AustinThrough November 29

Closed. Excavation Permit has been issued for this location.

the City of Austin
Secrest Dr eastbound near AustinThrough November 30

Closed. Excavation Permit has been issued for this location.

the City of Austin
W 44th StThrough November 30

Closed. Excavation Permit has been issued for this location. Details: * Original work dates Sep 30, 2026 - Oct 30, 2026 Extended on Oct 20, 2026 * Installing Wastewater Service by way of a 34' x 2' Excavation in the Street, and a 10' x 2' Excavation Behind the curb, and 5' of Curb Excavation, No Sidewalk…

the City of Austin
Laguna DrThrough November 30

Closed. Excavation Permit has been issued for this location. Details: Excavation will occur within the Laguna Drive public right-of-way at the Granada Drive intersection, primarily within the paved travel lanes, with localized utility and service excavation extending toward the curb/ROW as required.

the City of Austin
W 16th St near AustinThrough November 30

Closed. Excavation Permit has been issued for this location. Details: * Original work dates Sep 11, 2026 - Oct 11, 2026 Extended on Nov 20, 2026 Original work dates Sep 11, 2026 - Oct 11, 2026 Extended on Oct 30, 2026 Original work dates Sep 11, 2026 - Oct 11, 2026 Extended on Sep 25, 2026 * WO 707058 ¿…

the City of Austin
French PlThrough December 1

Closed. Excavation Permit has been issued for this location. Details: Arguijo will be constructing a water main along French Pl between 3200 French Pl & 3201 French Pl, continuing south to the intersection of French Pl and E 28th St. Water services will be installed in addition to the main.

the City of Austin
S Lamar Blvd near AustinThrough December 1

Excavation Permit has been issued for this location. Details: * Original work dates Jul 01, 2022 - Aug 01, 2022 Extended on Feb 27, 2026 *Permit was Finaled by Mistake - 10/03/25 RS closeout 3-28-25 EG * Original work dates Jul 01, 2022 - Aug 01, 2022 Extended on Jan 31, 2025 Original work dates…

the City of Austin
Maplewood Ave near AustinThrough December 3

Closed. Excavation Permit has been issued for this location.

the City of Austin
Park Ln near AustinThrough December 3

Closed. Excavation Permit has been issued for this location.

the City of Austin
Parkwood Rd near AustinThrough December 4

Closed. Excavation Permit has been issued for this location.

the City of Austin
Rochelle Dr near AustinThrough December 5

Closed. Excavation Permit has been issued for this location. Details: * Manual Extension End date Dec 05, 2026 Manual Extension End date Jul 31, 2026 Manual Extension End date Mar 31, 2026 Manual Extension End date Dec 31, 2025 * 2231.380 - Facilities Rehabilitation Inc will install approximately 1300 LF…

the City of Austin
S 6th StThrough December 5

Closed. Excavation Permit has been issued for this location. Details: Alpha will construct 20LF sidewalk, C&G, 1- curb ramp on S 6th St at W Mary St. This will require 1 20x12 street cut.

the City of Austin
E 10th StThrough December 5

Closed. Excavation Permit has been issued for this location. Details: Installing 450 feet of 6" wastewater line in a 2ft wide trench in pavement Installing 460 ft of 6" water line in a 2ft wide trench in pavement.

the City of Austin
Colony Park Dr southboundThrough December 7

Closed. Excavation Permit has been issued for this location. Details: * Manual Extension End date Dec 07, 2026 *Excavation will take place in the ROW within pavement as we are replacing the main water line. Most of the water line is 3ft front of curb in the pavement.

the City of Austin
Vera LnThrough December 12

Closed. Excavation Permit has been issued for this location. Details: We will be doing concrete and asphalt repairs working on the curbs and in the travel lanes of the road.

the City of Austin
W Riverside Dr near AustinThrough December 12

Closed. Excavation Permit has been issued for this location. Details: AUI will be remove and replace 51 ' of 4" pipe by way of excavating 2' wide and 55' long, remove and replace 74 ' of 6" pipe by way of excavating 2' wide and 74' long, 62' of 16" pipe by way of excavating 65' long and 2' wide and 2049'…

the City of Austin
Del Curto Rd near AustinThrough December 15

Closed. Excavation Permit has been issued for this location. Details: * Manual Extension End date Dec 15, 2026 *The Work consists of installation of approximately 1,837 LF of 18¿ to 42¿ storm sewers, 2,768 LF of box culverts, 2,311 LF of 2¿ to 12¿ water and wastewater lines, 10,901 SY of HMAC and…

the City of Austin
Lambie St near AustinThrough December 16

Closed. Excavation Permit has been issued for this location. Details: * Original work dates Oct 15, 2026 - Nov 15, 2026 Extended on Nov 16, 2026 Original work dates Oct 15, 2026 - Nov 15, 2026 Extended on Sep 21, 2026 Original work dates Oct 15, 2026 - Nov 15, 2026 Extended on Sep 04, 2026 Original work…

the City of Austin
Waller St near AustinThrough December 16

Closed. Excavation Permit has been issued for this location. Details: * Original work dates Oct 15, 2026 - Nov 15, 2025 Extended on Nov 16, 2026 Original work dates Oct 15, 2026 - Nov 15, 2025 Extended on Sep 21, 2026 Original work dates Oct 15, 2026 - Nov 15, 2025 Extended on Sep 01, 2026 Original work…

the City of Austin
Waller St near AustinThrough December 16

Closed. Excavation Permit has been issued for this location. Details: * Original work dates Oct 15, 2026 - Nov 15, 2026 Extended on Nov 16, 2026 Original work dates Oct 15, 2026 - Nov 15, 2026 Extended on Sep 21, 2026 Original work dates Oct 15, 2026 - Nov 15, 2026 Extended on Aug 28, 2026 Original work…

the City of Austin
Concho St near AustinThrough December 18

Closed. Excavation Permit has been issued for this location.

the City of Austin
E 4th St near AustinThrough December 18

Closed. Excavation Permit has been issued for this location.

the City of Austin
And 55 more
W 30th StNovember 30 to December 18

Closed. Excavation Permit has been issued for this location. Details: Excavation will be in W 30th St for the installation of waterline. Street Excavation is 52 LF x 3 LF. Curb Cut 3 LF Excavation Behind the Curb 4 LF x 3 LF Excavation Sidewalk 4 LF x 3 LF.

the City of Austin
White Horse TrlThrough December 18

Closed. Excavation Permit has been issued for this location. Details: * Original work dates Jul 13, 2026 - Oct 09, 2026 Extended on Nov 04, 2026 * Muniz will construct 69LF sidewalk, C&G, 26LF raised pedestrian crossing, 4- curb ramps on White Horse Trl at Wynona Ave.

the City of Austin
Gem Cir near AustinThrough December 20

Closed. Excavation Permit has been issued for this location. Details: * Original work dates Jul 20, 2026 - Sep 20, 2026 Extended on Oct 21, 2026 Original work dates Jul 20, 2026 - Sep 20, 2026 Extended on Sep 16, 2026 *Austin Water to replace approximately 110 LF of cast iron water main with PVC C900.

the City of Austin
Spicewood Mesa near AustinThrough December 20

Closed. Excavation Permit has been issued for this location.

the City of Austin
Colorado St near AustinDecember 1 to December 25

Closed. Excavation Permit has been issued for this location. Details: * Original work dates Jan 16, 2024 - Feb 14, 2024 Extended on Nov 19, 2026 Original work dates Jan 16, 2024 - Feb 14, 2024 Extended on Oct 26, 2026 Original work dates Jan 16, 2024 - Feb 14, 2024 Extended on Sep 29, 2026 Original work…

the City of Austin
Cheviot LnThrough December 26

Closed. Excavation Permit has been issued for this location. Details: We are going to install a new storm drain system to relieve the flooding in the area. We will install about 150 feet of RCP. We will start from the business entrance towards the service road. Excavation will be 150 x 3ft.

the City of Austin
Glissman Rd near AustinThrough December 26

Closed. Excavation Permit has been issued for this location.

the City of Austin
Springdale Rd southboundThrough December 26

Closed. Excavation Permit has been issued for this location. Details: Muniz will construct sidewalks and crosswalks for the MoKan Trail crossing on Springdale Rd. at Bolm Rd, adjacent to the CapMetro railroad crossing.

the City of Austin
Bar X DrThrough December 30

Closed. Excavation Permit has been issued for this location. Details: Asphalt patch to repair utility cuts in the travel lane There are 6 OPEN CUTS: Street Cuts on BAR X DR, 12200-12300 BLK (House number - Dims): 12206 - 12x13, 12211 - 17x26, 12300 - 12x13, 12303 - 18x26, 12306 - 17x13, 12310 - 33x26.

the City of Austin
Barton Pkwy southboundDecember 1 to December 30

Closed. Temporary use of Right of Way Permit has been issued for this location. Details: 31 extension from Oct 31, 2026 to Nov 30, 2026 30 extension from Oct 01, 2026 to Oct 30, 2026 WO 705345 - 2600 Rock Terrace Dr (Barton Pkwy) - AE/Mastec/Primoris/Renegade will replace OH wire from WP 09 to WP 14.

the City of Austin
Mount Barker Dr near AustinNovember 30 to December 30

Closed. Excavation Permit has been issued for this location.

the City of Austin
Nasco Dr near AustinThrough December 30

Closed. Excavation Permit has been issued for this location. Details: Work to include approximately 600 LF of new sewer main along nasco dr. Street cuts wil be 600x4ft. Two manholes will be installed with 8x8 street cuts.

the City of Austin
Blue Meadow DrThrough December 31

Closed. Excavation Permit has been issued for this location. Details: Excavation will take place in the street repairing existing wastewater line. Trench will be 5Ft Wide by 450Ft long.

the City of Austin
E 22nd St near AustinThrough December 31

Closed. Excavation Permit has been issued for this location. Details: * Original work dates May 18, 2026 - Jun 18, 2026 Extended on Oct 27, 2026 Original work dates May 18, 2026 - Jun 18, 2026 Extended on Sep 16, 2026 Original work dates May 18, 2026 - Jun 18, 2026 Extended on Aug 14, 2026 Original work…

the City of Austin
Northumberland Rd near AustinThrough December 31

Closed. Excavation Permit has been issued for this location. Details: * Manual Extension End date Dec 31, 2026 Manual Extension End date Aug 31, 2026 *Work to include installation of approximately 760ft of new water main along the ROW. Street Cuts will be 760ftx3ft.

the City of Austin
Toomey Rd near AustinThrough December 31

Closed. Excavation Permit has been issued for this location.

the City of Austin
White Rock Dr near AustinThrough December 31

Closed. Excavation Permit has been issued for this location. Details: *NO CONFLICT RESOLUTION RESPONSE RECEIVED WITH 2026-132823 EX, DO NOT EXTEND BEYOND 12/31/26 WITHOUT ADDITIONAL COORDINATION. IF THE WORK WILL BE PHASED, IT IS NECESSARY TO SUBMIT A REVISION REQUEST TO UPDATE YOUR PERMIT.

the City of Austin
Windsor Rd near AustinThrough December 31

Closed. Excavation Permit has been issued for this location. Details: * Manual Extension End date Dec 31, 2026 *work to include installation of new sewer main along ROW. street cuts will be 470ftx 4ft.

the City of Austin
Oxford Vineyard Ln near ManorThrough December 31

Closed. Excavation Permit has been issued for this location. Details: * Original work dates Aug 17, 2026 - Oct 02, 2026 Extended on Sep 29, 2026 * Revision (09/29/26): no work has started, additional 45 days ROW usage fees assessed with SDRC fee for 556 x 3 LF of Street cut on 12400 - 12425 blk of OXFORD…

the City of Austin
Poco DrThrough December 31

Closed. Excavation Permit has been issued for this location. Details: * Original work dates Aug 17, 2026 - Oct 02, 2026 Extended on Sep 29, 2026 *See permit 2026-100453-EX 1 Cut in entire POCO Dr - 166 lf long x 3 lf wide x 7 lf deep, entire cut in the travel lane to install sanitary sewer.

the City of Austin
Eason St near AustinDecember 2 to January 1

Closed. Excavation Permit has been issued for this location. Details: * Original work dates Oct 09, 2025 - Nov 09, 2025 Extended on Nov 19, 2026 Original work dates Oct 09, 2025 - Nov 09, 2025 Extended on Jul 31, 2026 * WO 652018 - 1104 Eason St (W 12th St) - AE/Mastec/Primoris/Renegade will remove pole…

the City of Austin
Kinney RdThrough January 1

Closed. Excavation Permit has been issued for this location. Details: * Manual Extension End date Jan 01, 2027 Manual Extension End date Jul 01, 2026 *Project consists of installation of Wastewater, Water and Storm drain in the street including all appurtenances.

the City of Austin
A Ln near AustinThrough January 2

Closed. Excavation Permit has been issued for this location. Details: Work to include approx. 450' of new sewer main, street cuts will be 450'x4'.

the City of Austin
Durwood St near AustinThrough January 2

Closed. Excavation Permit has been issued for this location. Details: * Original work dates Jun 01, 2026 - Jul 01, 2026 Extended on Nov 04, 2026 Original work dates Jun 01, 2026 - Jul 01, 2026 Extended on Aug 25, 2026 Original work dates Jun 01, 2026 - Jul 01, 2026 Extended on Jul 01, 2026 *Austin Water…

the City of Austin
Patton Ave near AustinThrough January 2

Closed. Excavation Permit has been issued for this location. Details: * Original work dates May 18, 2026 - Jun 18, 2026 Extended on Nov 04, 2026 Original work dates May 18, 2026 - Jun 18, 2026 Extended on Aug 25, 2026 Original work dates May 18, 2026 - Jun 18, 2026 Extended on Jul 01, 2026 *Austin Water to…

the City of Austin
W 3rd StThrough January 3

Closed. Temporary use of Right of Way Permit has been issued for this location. Details: 62 extension from Nov 03, 2026 to Jan 03, 2027 43 extension from Sep 21, 2026 to Nov 02, 2026 6039.128 - Cedar Hills Construction (Contractor) to use a 15ft x 75ft space adjacent to the curb per attached TCP on the 500…

the City of Austin
Lily Ter near AustinThrough January 6

Closed. Excavation Permit has been issued for this location. Details: * Original work dates May 04, 2026 - Jul 04, 2026 Extended on Nov 05, 2026 Original work dates May 04, 2026 - Jul 04, 2026 Extended on Sep 01, 2026 Original work dates May 04, 2026 - Jul 04, 2026 Extended on Jul 02, 2026 *Austin Water…

the City of Austin
Pond Springs RdThrough January 8

Closed. Excavation Permit has been issued for this location. Details: 1224 LF 46 LF Roxie We will begin open trench excavation on Pond Springs Road at the Tributary 3 north side headwall and install 27 LF of 5' x 4' box culvert going towards the center of the Pond Springs Road.

the City of Austin
Colony Loop DrThrough January 10

Closed. Excavation Permit has been issued for this location. Details: DeNucci will construct 103LF SUP, C&G, 2- curb ramps on Colony Loop at Loyola. This will require 1- 29x13, 1- 74x12 street cuts.

the City of Austin
Ross Rd near Del ValleThrough January 11

Closed. Excavation Permit has been issued for this location. Details: DO NOT EXTEND BEYOND 01/11/27 WITHOUT ADDITIONAL COORDINATION. IF THE WORK WILL BE PHASED, IT IS NECESSARY TO SUBMIT A REVISION REQUEST TO UPDATE YOUR PERMIT.

the City of Austin
Alden DrThrough January 15

Closed. Excavation Permit has been issued for this location. Details: Excavation will take place in the travel lane, behind curb, sidewalk, and driveway. 2 cuts approx 4' wide by 40' long and 1 cut approx 2' wide by 100' long. The full ROW will be required for the work zone according to the LOC.

the City of Austin
Bangor BndThrough January 15

Closed. Excavation Permit has been issued for this location. Details: Excavation will take place in the travel lane, behind curb, sidewalk, and driveway. 1 cut approx 8' wide by 150' long and 1 cut approx 3' wide by 40' long. The full ROW will be required for the work zone according to the LOC.

the City of Austin
Chesapeake DrThrough January 15

Closed. Excavation Permit has been issued for this location. Details: Excavation will take place in the travel lane, behind curb, sidewalk, and driveway. 3 cuts approx 5' wide by 70' long, 4' wide by 20' long, and 4' wide by 30' long 1 cut approx 2' wide by 105' long 1 cut approx 3' wide by 20' long.

the City of Austin
Leesburg CirThrough January 15

Closed. Excavation Permit has been issued for this location. Details: Excavation will take place in the travel lane, sidewalk, behind curb, and driveway. 1 cut approximately 5' wide by 80' long and 1 cut approx 3' wide by 20' long. The full ROW will be required for the work area according to the LOC.

the City of Austin
Plymouth DrThrough January 15

Closed. Excavation Permit has been issued for this location. Details: Excavation will take place in the travel lane, behind curb, sidewalk, and driveway. 3 cuts approx 8' wide by 8' long, 4' wide by 50' long, and 3' wide by 20' long. 2 cuts approx 3' wide by 120' long and 2' wide by 20' long.

the City of Austin
Quail Park Dr near AustinThrough January 16

Closed. Excavation Permit has been issued for this location. Details: This is asphalt and concrete restoration work being done by my listed contractor Alpha Paving. The reason for the repairs is because Austin Water CRS performed a Poly B replacement project and left temporary patches.

the City of Austin
Sierra Nevada near AustinThrough January 16

Closed. Excavation Permit has been issued for this location.

the City of Austin
Miriam Ave near AustinThrough January 18

Closed. Excavation Permit has been issued for this location.

the City of Austin
Leaning Oak Cir near AustinThrough January 19

Closed. Excavation Permit has been issued for this location. Details: Austin Water scheduled to replace approximately 149 LF of water main on Pin Oak Cir. There are also 3 water service lines that will be replaced as well.

the City of Austin
Pin Oak Ct near AustinThrough January 19

Closed. Excavation Permit has been issued for this location. Details: Austin Water scheduled to replace approximately 283 LF of water main on Pin Oak Cir. There are also 6 water service lines that will be replaced as well.

the City of Austin
Newfield Ln near AustinThrough January 20

Closed. Excavation Permit has been issued for this location. Details: * Manual Extension End date Jan 20, 2027 Manual Extension End date Apr 30, 2026 *Work to include installation of approximately 1300 ft of wastewater main along ROW on Newfield Lane. street cuts will be approximate 1300x4ft.

the City of Austin
E 2nd St eastboundThrough January 22

Closed. Excavation Permit has been issued for this location. Details: * Original work dates Jun 22, 2026 - Oct 22, 2026 Extended on Oct 21, 2026 *Muniz will electrify the existing bike station on E 2nd St between Congress and Brazos. This will require 1- 3x36 street cut. This is a maintenance project.

the City of Austin
Thompson Ln near AustinThrough January 23

Closed. Excavation Permit has been issued for this location.

the City of Austin
Center Line Pass northbound near AustinNovember 30 to January 30, 2027

Closed. Excavation Permit has been issued for this location. Details: AE/Mastec/Renegade/GridCo/Capital Excavation Co. Dell Duct Bank Installation - to install duct bank on Center Line Pass, approximately 1952 LF via open trench.

the City of Austin
Mc Callen PassNovember 30 to January 30, 2027

Closed. Excavation Permit has been issued for this location. Details: AE/Mastec/Renegade/GridCo/Capital Excavation Co. Dell Duct Bank Installation to install duct bank on McCallen Pass approximately 3308 LF via open trench and 445ft bore. 2 cuts to curb at each end of work area on McAllen Pass.

the City of Austin
Cardinal LnThrough January 31, 2027

Closed. Excavation Permit has been issued for this location. Details: * Manual Extension End date Jan 31, 2027 Original work dates Jul 29, 2025 - Jan 30, 2026 Extended on Jan 20, 2026 Manual Extension End date Jul 31, 2026 *2231.342 - DeNucci Constructors will be installing Wastewater Main pipe in the road…

the City of Austin
Jollyville Rd eastboundThrough February 1, 2027

Closed. Excavation Permit has been issued for this location. Details: This project is included in the City of Austin Transportation and Public Works 2025 Miscellaneous Streets Overlay IDIQ CLMC1070.

the City of Austin
Jamestown DrThrough February 3, 2027

Closed. Excavation Permit has been issued for this location. Details: Excavation will take place in the travel lane, behind curb, sidewalk, and driveway. 1 Cut - Approx 155' x 3' 1 Cut - Approx. 500' x 3' 1 Cut - Approx 465' x 3' 1 Cut - Approx 60' x 2' 5 Cuts - Approx.

the City of Austin
Algarita Ave near AustinThrough February 5, 2027

Closed. Excavation Permit has been issued for this location. Details: 6395.077 - Work to include installation of 518ft of new water main along ROW, Street cuts will be 518ftx3ft. CIP inspector is Oscar Arredondo.

the City of Austin
Thornton RdThrough February 5, 2027

Closed. Excavation Permit has been issued for this location. Details: * Manual Extension End date Feb 05, 2027 Manual Extension End date Jul 28, 2026 * 5789.069 - Project consist of installation of Wastewater, Water and Storm drain in the street including all appurtenances.

the City of Austin
Alta Vista Ave near AustinThrough February 13, 2027

Closed. Excavation Permit has been issued for this location. Details: 6395.077 - Work includes installation of 1300ft of new water main, street cuts will be 1300ftx3ft. CIP inspector is Oscar Arredondo.

the City of Austin
Larry Ln near AustinDecember 16 to February 16, 2027

Closed. Excavation Permit has been issued for this location.

the City of Austin
Merrie Lynn Ave near AustinDecember 16 to February 16, 2027

Closed. Excavation Permit has been issued for this location.

the City of Austin
Pearce Ln near Del ValleThrough February 18, 2027

Closed. Excavation Permit has been issued for this location. Details: *PER COORDINATION WITH 2026 090665 EX, THIS PROJECT NOT SCHEDULED TO BEGIN UNTIL SOMETIME AFTER 10/01/26 ON 12712-12925 BLOCK OF PEARCE LANE Excavation will take place behind the south edge of pavement on Pearce Lane for 2200 LF until it…

the City of Austin
Blair Way near AustinThrough February 20, 2027

Closed. Excavation Permit has been issued for this location. Details: * Manual Extension End date Feb 20, 2027 * Existing 8¿ PVC to be cut and plugged, abandoned line filled with CLSM, utilizing a 4¿ wide by 20' long street cut on Blair Way travel lane.

the City of Austin

Airport

  • Austin Bergstrom International Airport (AUS)

    No delays reported right now.

More cities

Or see all of Texas, every city, or what's near you.